Portfolio Management

| Site Survey and Design

 

Preliminary Survey (during site acquisition stage)
Checking legal restriction & good neighbor relation to determine legal status of proposed site and to meet the city’s zoning law (cities master plan) or planed land usage.
To be on the best location for Transmission, service coverage, access to the site & availability of commercial power, Environmental condition of the site, such as the site is far from the school & parks…

Technical Site Survey (TSS)

Following the preliminary survey report technical site surveys are inspections of an area where work is proposed, to gather information for a design or an estimate to complete the initial tasks required for an outdoor activity. It can determine a precise location, access, best orientation for the site and the location of obstacles

               


| Detail Construction Design


Civil work design
Foundation design, it depend on the tower structure & bearing capacity of the soil, mostly this design is provided by the tower supplier.
Site design includes site layout, position of tower foundation, slabs , Grounding layout and others…
Electrical Design
Electrical installation layout of all equipment’s in the site using the underground buried pipe.
RF installation design
Position of vertical & horizontal cable tray to install the RF cables and the height & azimuth of GSM & MW

           

Logistic and Warehouse management

Control the movement and handling of tower and other project material within the warehouse and throughout project sites. which includes

  • Receiving project material ,
  • Sorting and checking against project BOQ, packing list and tower drawing,
  • Missing report to supplier
  • Manufacture or order the missing
  • Prepare kit for different deliveries
  • Pack and deliver as per site configuration or kit